{"id":1221,"date":"2021-03-20T21:09:21","date_gmt":"2021-03-21T01:09:21","guid":{"rendered":"http:\/\/www.otterlakecmc.ca\/?page_id=1221"},"modified":"2024-02-25T03:05:14","modified_gmt":"2024-02-25T07:05:14","slug":"news-halifax-waste-resource-society","status":"publish","type":"page","link":"https:\/\/www.otterlakecmc.ca\/?page_id=1221","title":{"rendered":"News &#8211; HWRS"},"content":{"rendered":"\n<p>Jason Timms February 25, 2024<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-1694 size-full\" src=\"https:\/\/www.otterlakecmc.ca\/wp-content\/uploads\/2024\/02\/otterlake_cmc_hwrs_meeting_notice_2024.png\" alt=\"\" width=\"1080\" height=\"960\" \/><\/p>\n\n\n\n<h3>Halifax Waste Resource Society Loses Appeal<\/h3>\n<div class=\"entry-byline font-secondary\"><span class=\"entry-author\">Jason Timms<\/span> <time class=\"entry-published updated\" title=\"Thursday, June 30, 2022, 4:54 pm\" datetime=\"2022-06-30T16:54:17-04:00\">June 30, 2022<\/time><\/div>\n<p>Nova Scotia Environment and Climate Change Minister Tim Halman has rejected the Halifax Waste Resource Society\u2019s appeal to disallow the conditional deactivation of the front-end processor and waste stabilization facility at the Otter Lake Landfill.&nbsp; [ <a href=\"https:\/\/www.otterlakecmc.ca\/wp-content\/uploads\/2022\/06\/58191_halifax_waste_resource_society_decision_letter.pdf\" target=\"_blank\" rel=\"noopener\">view \/ download the minister\u2019s decision<\/a> ]<img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-1471\" src=\"https:\/\/www.otterlakecmc.ca\/wp-content\/uploads\/2022\/06\/pdf-150x150.jpg\" alt=\"\" width=\"20\" height=\"20\" srcset=\"https:\/\/www.otterlakecmc.ca\/wp-content\/uploads\/2022\/06\/pdf-150x150.jpg 150w, https:\/\/www.otterlakecmc.ca\/wp-content\/uploads\/2022\/06\/pdf.jpg 300w\" sizes=\"auto, (max-width: 20px) 100vw, 20px\" \/><\/p>\n<p>The society now plans to weigh its options at the next board of directors meeting.<\/p>\n<p>Mr. Halman also rejected similar appeals from John Cascadden and Scott Guthrie, both former chairs of the Halifax Waste Resource Society and the Community Monitoring Committee. Mr. Cascadden is a member of the current board of directors for the Halifax Waste Resources Society while Mr. Guthrie just relinquished his leadership after five years at the helm.<\/p>\n<p>The minister\u2019s decision is the latest setback by the society and its subsidiary organization, the Community Monitoring Committee, in their campaign to keep the equipment operating. The organizations represent the interests of the communities within a five km. radius of the landfill. They include the Timberlea, Lakeside, Beechville, Prospect and Hubley area communities<\/p>\n<p>Together the front-end processor (FEP) and waste stabilization facility (WSF) remove and stabilize organic waste found in residential garbage at the landfill site before the rest is buried. Also removed by the FEP hazardous waste products and recyclable waste paper and plastic. The equipment stops the build up of organic waste in the landfill that can lead to explosions in rodent and scavenger bird populations, the circulation of bad odours and other issues. Problems such as road litter are also avoided and the removal of hazardous products helps the landfill steer clear of other potential environmental problems.<\/p>\n<p>The Halifax Regional Municipality, the owner of the landfill and Mirror Nova Scotia. the landfill operator, received conditional approval for their plan to switch off the equipment earlier this year from the Nova Scotia Department of Environment and Climate Change.&nbsp; The approval is \u201ccontingent upon obtaining subsequent approval of a Compliance Plan,\u201d Mr. Halman noted in his decision.<\/p>\n<p>HRM and Mirror Nova Scotia filed their compliance plan with the province, June 29.<\/p>\n<p>The minister explained, \u201cThe plan will detail how the facility will achieve its performance targets &#8211; compostable waste shall not exceed ten percent (10%) of total amount of municipal solid waste landfilled, by mass; and the recovery of visible white goods as well as dangerous\/waste dangerous goods\/household hazardous wastes. Prior to the acceptance of the compliance plan all municipal solid waste shall be processed through the FEP, with all organic material being sent to the WSF. Presently, there are no changes in the operation of the landfill.<\/p>\n<p>\u201cWhile certain designated materials are banned from landfills, these materials will still be received despite the extraordinary efforts by government, municipalities, organizations, private companies, and individuals to divert them for recycling. The current criteria are to insert a target level for banned materials in a landfill approval as a term and condition to improve diversion and mitigate environmental effects over and above those provided for through landfill design and operation.\u2019<\/p>\n<p>The society argued the department\u2019s approved changes will encourage residents to stop sorting their garbage once they realize the landfill has become a truck and dump operation. The minister countered that \u201cGoing forward the landfill will be required to meet certain diversion targets in order to allow the FEP\/WSF to be discontinued. This should create an incentive for HRM to continue to encourage residents to properly sort and dispose of their waste.\u201d<\/p>\n<p>The minister was satisfied that \u201cThe technical review of the application concluded that there would be no off-site impacts or increase in leachate over the designed volume of the cells and no increased risk associated with Dangerous Goods (which amount for less than 2% of the waste and includes Household Hazardous waste). There is no requirement for front-end processing or waste stabilization under provincial guidelines.\u201d<\/p>\n<p>On the sensitive issue of alleged environmental racism with the siting of the landfill close to the historically black community of Beechville, the minister responded, \u201cWe recognize environmental racism exists in the province. We are working as a province to address its impacts. The department does not approve the siting of landfills rather we ensure its construction and operation adheres to the Environment Act and regulations. In this instance, we have ensured the terms and conditions in this approval will ensure this solid waste facility operates in a manner, which does not impact the environment negatively.\u201d<\/p>\n<p>Various problems, including an alleged conflict of interest associated with the public survey, were raised by the society in its appeal. The survey was an electronic questionnaire on the HRM\u2019s website, that tested public satisfaction with various mitigation methods to deal with potential problems at the landfill after the deactivation. The survey was developed by Dillon Consulting, the same company that prepared the Closure Review Report on the FEP\/WSF for HRM and Mirror Nova Scotia. The alleged conflict was flagged by Don Mills, a well-known Nova Scotia pollster, in a report on the survey he prepared for the society.<\/p>\n<p>The minister stated, \u201cAs part of the application, the HRM\/Mirror was required to undertake public consultation in accordance with the NSECC Public Consultative process. The applicant followed this process to the satisfaction of the department. There is no requirement for the consultation to be undertaken by a third party or preventing Dillon Consulting from leading the consultation process. 97% of respondents raised concerns however none differed from those already raised or expressed by the Community Monitoring Committee\/HWRS. The concerns raised were already known to the Department.\u201d<\/p>\n<p>And on the issue that the proposed deactivation breaks the 1999 agreement between the society and HRM that allowed the landfill to be sited at Otter Lake, the minister replied that \u201cThe Nova Scotia Department of Environment and Climate Change is not a party or signatory to the 1999 agreement. We do not have the authority to enforce the terms of a privately arranged agreement between two other parties. The Halifax Waste Resource Society is encouraged to seek legal advice concerning what options they may have under the agreement.\u201d<\/p>\n<p>The society noted a 2013 resolution was introduced by the PC caucus and unanimously adopted by the legislature committed the government to enforce the 1999 agreement and reject the deactivation of the FEP\/WSF. The minister deemed the resolution irrelevant. He stated, \u201cAn administrator evaluating the merits of an application to amend an approval, must consider the relevant factors under the Environment Act and regulations, standards and guidelines. This must be done fairly, based on the relevant science, technical and engineering information before the decision maker. Resolution No. 794 was made at a different time and circumstances and does not bind the decision making of myself or an Administrator acting under delegated authority.\u201d<\/p>\n<hr>\n\n\n\n<h3>The HALIFAX WASTE RESOURCE SOCIETY&#8217;S ANNUAL GENERAL MEETING<\/h3>\n<h4>THE CHAIR&#8217;S YEAR-END REMARKS for FISCAL YEAR 2021-2022<\/h4>\n<div class=\"entry-byline font-secondary\"><span class=\"entry-author\">Jason Timms<\/span> June 16 <time class=\"entry-published updated\" title=\"JUNE 16, 2022\" datetime=\"2022-06-13T14:54:27-04:00\">, 2022<\/time> <a class=\"comments-link\" href=\"https:\/\/www.otterlakecmc.ca\/?p=1188#respond\">0<\/a><\/div>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter\" src=\"https:\/\/www.otterlakecmc.ca\/wp-content\/uploads\/2016\/03\/Meeting-300x200.jpg\" srcset=\"https:\/\/www.otterlakecmc.ca\/wp-content\/uploads\/2016\/03\/Meeting-300x200.jpg 300w, https:\/\/www.otterlakecmc.ca\/wp-content\/uploads\/2016\/03\/Meeting.jpg 500w\" alt=\"Marketing Analysis Accounting Team Teamwork Business Meeting Con\" width=\"428\" height=\"285\" \/><\/p>\n<p>Your Halifax Waste Resource Society has been preoccupied this fiscal year with the growing erosion of our 1999 agreement with the Halifax Regional Municipality on the operations of the Otter Lake Landfill. The past 12 months have been a challenge and the society expects the issue will dominate the HWRS agenda again this year.<\/p>\n<p>From our perspective, HRM has been chipping away at the integrity of our1999 agreement, which sets out the parameters for the landfill\u2019s operation.<\/p>\n<p>As a signatory to the agreement, the society feels obligated to safeguard the agreement, as best it can, in the interests of residents in the Timberlea, Lakeside, Beechville, Prospect and Hubley area communities. We know they depend on the society to represent them on matters that relate to the landfill.<\/p>\n<p>Over our strenuous objections, HRM \u2013 in partnership with Mirror Nova Scotia \u2013gained conditional approval, in March of this year, from the Nova Scotia Department of Environment and Climate Change to sideline the front-end processor and waste stabilization facility at the landfill. Both processes are cited in the 1999 agreement and they are implicitly connected to the pledge that only \u201cacceptable waste\u201d will be permitted in the landfill. We feel HRM\u2019s actions have contravened the agreement.<\/p>\n<p>The society fully supported the Community Monitoring Committee in its efforts to oppose the application. Earlier on, we also declined to participate in an HRM pilot project to test the effects of deactivation because we felt it would flout the existing agreement.<\/p>\n<p>On another front we were dismayed to observe an HRM elected official repeatedly level unfounded allegations publicly against some of our Community Monitoring Committee personnel \u2013 myself included. That incident was mentioned in my CMC remarks as well.<\/p>\n<p>The CMC was setup under the 1999 agreement and its task is to monitor landfill activities. Primarily, its membership is drawn from volunteers in our communities along with a smaller designated group of HRM councilllors.<\/p>\n<p>The actions by one member of the latter group seemed to be aimed at undermining CMC\u2019s reputation and activities, mainly, we suspect, because it took the lead in opposing the deactivation of the landfill\u2019s front-end processor and waste stabilization facility. The councilor in question has been an ardent and vocal supporter of the HRM plan. All this is very troubling to the society and I am certain it will be seeking to restore the harmony and goodwill that up until this past fiscal year the CMC and the society have always enjoyed with HRM.<\/p>\n<p>Here are some of the issues we faced this past fiscal year:<\/p>\n<p>The society was <em>not<\/em> invited to speak to Council on the proposed changes to the Otter Lake facility\u2019s operations. Only the Community Monitoring Committee, was given this privilege. We found the oversight needlessly discourteous. It is the society, not CMC, which is party to the 1999 contractual agreement with HRM on the operation of the Otter Lake Landfill.<\/p>\n<p>I am sorry to report that this relationship has been largely ignored by HRM in the municipality\u2019s efforts to secure provincial approval for the deactivation of the front end processor and waste stabilization facility.<\/p>\n<p>Nevertheless, the society set out its position in a March 18, 2021 letter to Mayor Mike Savage. We endorsed the CMC\u2019s call for continued operation of the front-end processor and waste stabilization facility. We stated that based on the legal review of our 1999 agreement, any change to the standard of \u201cacceptable waste\u201d as set out in the agreement could only be achieved by mutual negotiations and the consent of both parties. As set out in the agreement, the term, \u201cacceptable waste.\u2019 refers to stable materials, substantially free of putrescible elements after biostabilization.<\/p>\n<p>We told the mayor the society was willing to accept changes to the landfill\u2019s operations, provided they achieved the same level of \u2018acceptable waste\u2019 now attained through use of the front-end processor and waste stabilization facility. We also indicated we were open to any proposals that would produce the same result.<\/p>\n<p>We only asked that proposed alternatives be based on the current residential garbage volume of roughly 40,000 tons a year that currently goes to Otter Lake and be capable of accommodating increases in volume in the range of 90,000 tons a year.\u00a0 That added stipulation was a safeguard, in case industrial and commercial waste, now trucked outside the municipality, return to Otter Lake for disposal. We received no proposals from HRM.<\/p>\n<p>The society wrote to the Premier in February to remind him of a 2013 Conservative resolution that received the legislature\u2019s unanimous approval during a previous attempt to deactivate the front-end processor and waste stabilization facility. The resolution directed the Minister of Environment of the day to reject any requested changes to the operating permit for the Otter Lake Landfiill that involved curtailing the operation of the front-end processor and waste stabilization facility.<\/p>\n<p>At the time, Jamie Baillie, then leader of the Conservative Party, assured us his caucus would \u201censure that no changes are made to the current operating permit issued by the Department of Environment for the Otter Lake facility that would downgrade the high environmental standards that are presently in effect.\u201d<\/p>\n<p>It goes without saying, we were disappointed that the present Conservative government chose to ignore the 2013 resolution.<\/p>\n<p>In late April this year, we sent the key official in the Department of Environment and Climate Change, who was administering the HRM-Mirror Nova Scotia application, a copy of the Review of the Otter Lake Consultation Report prepared by Don Mills, an independent consultant and well-known pollster.<\/p>\n<p>The consultation report on which the review was based, evaluated the results of the public survey in support of the HRM-Mirror Nova Scotia application. It had been prepared by Dillon Consulting Ltd.<\/p>\n<p>Mr. Mills took a close look at that evaluation and developed his report. We hoped Mr. Mill\u2019s assessment would provide a reality check on the conclusions reached by Dillon Consulting.<\/p>\n<p>Among other things, Mr. Mills pointed out that Dillon Consulting was the same group that prepared the Closure Review Report for HRM and crafted the controversial public survey. In other words Dillon Consulting had engaged in a professional conflict of interest. The Minister of Environment and Climate Change was cc\u2019d on the letter sent to the senior member of his departmental staff.<\/p>\n<p>When we got the news in late March that the department had conditionally green-lighted the HRM-Mirror Nova Scotia application, we set to work on an appeal to the minister.<\/p>\n<p>We filled it in May and we are expecting a decision by June 27 \u2013 a little more than a week from today. However the wait could be longer if the department requires more time.<\/p>\n<p>Are there any questions?<\/p>\n<p>Submitted on behalf of the HWRS.\u00a0<\/p>\n<p>Scott Guthrie, Chair<\/p>\n<hr \/>\n<h3>HWRS to Appeal Otter Lake Landfill Decision<\/h3>\n<div class=\"entry-byline font-secondary\"><span class=\"entry-author\">Jason Timms<\/span> April 4<time class=\"entry-published updated\" title=\"April 4, 2021\" datetime=\"2021-03-15T14:54:27-04:00\">, 2022<\/time> <a class=\"comments-link\" href=\"https:\/\/www.otterlakecmc.ca\/?p=1188#respond\">0<\/a><\/div>\n<p><a href=\"_wp_link_placeholder\" data-wplink-edit=\"true\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-1408 aligncenter\" src=\"https:\/\/www.otterlakecmc.ca\/wp-content\/uploads\/2022\/04\/FEP-Sorters-at-the-Otter-Lake-Landfill-Sharpen-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.otterlakecmc.ca\/wp-content\/uploads\/2022\/04\/FEP-Sorters-at-the-Otter-Lake-Landfill-Sharpen-300x169.jpg 300w, https:\/\/www.otterlakecmc.ca\/wp-content\/uploads\/2022\/04\/FEP-Sorters-at-the-Otter-Lake-Landfill-Sharpen-1024x576.jpg 1024w, https:\/\/www.otterlakecmc.ca\/wp-content\/uploads\/2022\/04\/FEP-Sorters-at-the-Otter-Lake-Landfill-Sharpen-768x432.jpg 768w, https:\/\/www.otterlakecmc.ca\/wp-content\/uploads\/2022\/04\/FEP-Sorters-at-the-Otter-Lake-Landfill-Sharpen-1536x865.jpg 1536w, https:\/\/www.otterlakecmc.ca\/wp-content\/uploads\/2022\/04\/FEP-Sorters-at-the-Otter-Lake-Landfill-Sharpen-2048x1153.jpg 2048w, https:\/\/www.otterlakecmc.ca\/wp-content\/uploads\/2022\/04\/FEP-Sorters-at-the-Otter-Lake-Landfill-Sharpen-888x500.jpg 888w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>The Halifax-Waste Resource Society is appealing the March 22 provincial decision that will allow Otter Lake Landfill to operate without its long-time protections against odour, litter, hazardous waste and infestations of rodents and scavenger birds.<\/p>\n<p>The HWRS represents all residents of the Halifax Regional Municipality, but in particular those who reside within a five-km. radius of the landfill. The society is a signatory to the 1999 agreement with the Halifax Regional Municipality that permitted the landfill to be sited at Otter Lake. The agreement also set broad terms under which the facility would operate. <br \/><br \/>The appeal will be made to Tim Halman, the Nova Scotia Minister of Environment and Climate Change.<\/p>\n<p>Should any aggrieved individual or organization also wish to appeal the decision, the pdf appeal form can be downloaded here: <a href=\"https:\/\/novascotia.ca\/nse\/dept\/docs\/Notice-of-Appeal-Form.pdf\">https:\/\/novascotia.ca\/nse\/dept\/docs\/Notice-of-Appeal-Form.pdf<\/a>. A $108.95 fee is required to accompany a completed form. The deadline to lodge an appeal on this matter is April 21.<\/p>\n<p>The administrative-level decision of March 22 sets forth the conditions that will permit Halifax Regional Municipality, the owner of the landfill, and Mirror Nova Scotia Ltd., the operator, to deactivate the front-end processor and waste stabilization facility.<\/p>\n<p>The front-end processor opens and inspects all residential garbage arriving at the landfill and removes decaying organic matter, hazardous waste and recyclables such as plastics and paper. The waste stabilization facility takes the retrieved organic matter and renders it inert before it is buried with other waste at the landfill. Decaying, unprocessed organic matter is known to attract rodent and scavenger bird populations and to cause noxious odours at landfills.<\/p>\n<p>The HWRS and the Community Monitoring Committee opposed the recently approved HRM-Mirror Nova Scotia application to deactivate the front-end processor and waste stabilization facility.<\/p>\n<p>The CMC, established by the HWRS and HRM, does community monitoring of the landfill\u2019s operations.<\/p>\n<hr \/>\n<h3>Halifax Waste Resource Society decides to Appeal to the Minister of the DOECC his department\u2019s decision on the HRM Application of August, 2022<\/h3>\n<div class=\"entry-byline font-secondary\"><span class=\"entry-author\">Jason Timms<\/span>\u00a0 April <time class=\"entry-published updated\" title=\"Monday, March 15, 2021, 2:54 pm\" datetime=\"2021-03-15T14:54:27-04:00\">1, 2022<\/time> <a class=\"comments-link\" href=\"https:\/\/www.otterlakecmc.ca\/?p=1188#respond\">0<\/a><\/div>\n<p>FOR IMMEDIATE RELEASE<br \/>Halifax Waste-Resource Society to Appeal Province\u2019s Decision on Otter Lake Landfill.<\/p>\n<p>[ <a href=\"https:\/\/www.otterlakecmc.ca\/wp-content\/uploads\/2022\/04\/hwrs_press_release-01-apr-2022.pdf\" target=\"_blank\" rel=\"noopener\">download article here<\/a> ]<\/p>\n<hr \/>\n<h3>A letter to Mayor Mike Savage<\/h3>\n<div class=\"entry-byline font-secondary\"><i class=\"fa fa-user\"><\/i> <span class=\"entry-author\">Jason Timms<\/span> <i class=\"fa fa-calendar\"><\/i> <time class=\"entry-published updated\" title=\"Monday, March 15, 2021, 2:54 pm\" datetime=\"2021-03-15T14:54:27-04:00\">March 23, 2021<\/time> <i class=\"fa fa-comment-o\"><\/i> <a class=\"comments-link\" href=\"https:\/\/www.otterlakecmc.ca\/?p=1188#respond\">0<\/a><\/div>\n<p>A letter to Mayor Mike Savage regarding the removal of the WSF\/FEP<\/p>\n<p>The Halifax Waste-Resource Society has sent a letter to Mayor Mike Savage (<a href=\"https:\/\/www.otterlakecmc.ca\/wp-content\/uploads\/2021\/03\/hwrs_letter_to_mayor_18_mar_2021_fep_wsf.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">click here to view file<\/a>) responding\u00a0 to HRM staff&#8217;s\u00a0 proposed removal of the Front End Processor (FEP) and Waste Stabilization Facility (WSF) at the Otter Lake Landfill.\u00a0<\/p>\n<hr \/>\n<h3>The HRM Report proposing the removal of the FEP &amp; WSF<\/h3>\n<div class=\"entry-byline font-secondary\"><i class=\"fa fa-user\"><\/i> <span class=\"entry-author\">Jason Timms<\/span> <i class=\"fa fa-calendar\"><\/i> <time class=\"entry-published updated\" title=\"Monday, March 15, 2021, 2:54 pm\" datetime=\"2021-03-15T14:54:27-04:00\">March 13, 2021<\/time> <i class=\"fa fa-comment-o\"><\/i> <a class=\"comments-link\" href=\"https:\/\/www.otterlakecmc.ca\/?p=1188#respond\">0<\/a><\/div>\n<p>The HRM Report proposing the removal of the FEP &amp; WSF (Jan. 21,2021) &#8211; and which both CMC and HWRS responds to as provided above. Click <a href=\"https:\/\/www.otterlakecmc.ca\/wp-content\/uploads\/2021\/03\/2020-12-04_ltrand_rtp_philopoulos_reply_to_guthrie-signed.pdf\" target=\"_blank\" rel=\"noopener\">here<\/a> to view the report.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Jason Timms February 25, 2024 Halifax Waste Resource Society Loses Appeal Jason Timms June 30, 2022 Nova Scotia Environment and Climate Change Minister Tim Halman has rejected the Halifax Waste <a href=\"https:\/\/www.otterlakecmc.ca\/?page_id=1221\" class=\"more-link\">[&hellip;]<\/a\n<\/p>\n","protected":false},"author":8,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["entry","page","publish","author-jtimms","post-1221"],"jetpack_shortlink":"https:\/\/wp.me\/P7oNTv-jH","jetpack-related-posts":[{"id":87,"url":"https:\/\/www.otterlakecmc.ca\/?page_id=87","url_meta":{"origin":1221,"position":0},"title":"Members of CMC","author":"Mary-Frances Lynch","date":"March 30, 2016","format":false,"excerpt":"The Otter Lake Community Monitoring Committee or CMC has 10 members. Three are volunteers from Halifax Regional Municipality (HRM) who are appointed by the Regional Municipal Council. Six are chosen through the citizens\u2019 group, the Halifax Waste-Resources Society that represents the interests of communities in close proximity to the Otter\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":1750,"url":"https:\/\/www.otterlakecmc.ca\/?page_id=1750","url_meta":{"origin":1221,"position":1},"title":"Performance Audits","author":"Jason Timms","date":"April 16, 2024","format":false,"excerpt":"These quarterly audits of Otter Lake Landfill\u2019s compostable waste track HRM\u2019s efforts to ensure that by March 31, 2026 the percentage of compostable waste going into the landfill will be 10 per cent of the total amount of solid waste by mass. The Nova Scotia Department of Environment and Climate\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":321,"url":"https:\/\/www.otterlakecmc.ca\/?page_id=321","url_meta":{"origin":1221,"position":2},"title":"Halifax Waste Resource Society","author":"Mary-Frances Lynch","date":"May 23, 2016","format":false,"excerpt":"The Halifax Waste\/Resource Society was established in 1999 to represent the interests of residents with respect to the Otter Lake Landfill. The Society is registered under the Nova Scotia Society's Act. An agreement between the Society and Halifax Regional Municipality established the Otter Lake Community Monitoring Committee. There are 6\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"Halifax Waste Resource Society","src":"https:\/\/i0.wp.com\/www.otterlakecmc.ca\/wp-content\/uploads\/2019\/03\/hwrc_logo-300x113.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":1245,"url":"https:\/\/www.otterlakecmc.ca\/?page_id=1245","url_meta":{"origin":1221,"position":3},"title":"HWRS","author":"Jason Timms","date":"April 26, 2021","format":false,"excerpt":"","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":1749,"url":"https:\/\/www.otterlakecmc.ca\/?page_id=1749","url_meta":{"origin":1221,"position":4},"title":"Performance Audits","author":"Jason Timms","date":"April 16, 2024","format":false,"excerpt":"","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":1117,"url":"https:\/\/www.otterlakecmc.ca\/?page_id=1117","url_meta":{"origin":1221,"position":5},"title":"1998 Meeting Minutes","author":"Jason Timms","date":"January 24, 2021","format":false,"excerpt":"These are the minutes of the 1998 meetings. 1998 Meeting Minutes June 24 Minutes July 2 Minutes July 14 Minutes","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"jetpack_likes_enabled":false,"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.otterlakecmc.ca\/index.php?rest_route=\/wp\/v2\/pages\/1221","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.otterlakecmc.ca\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.otterlakecmc.ca\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.otterlakecmc.ca\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.otterlakecmc.ca\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1221"}],"version-history":[{"count":17,"href":"https:\/\/www.otterlakecmc.ca\/index.php?rest_route=\/wp\/v2\/pages\/1221\/revisions"}],"predecessor-version":[{"id":1697,"href":"https:\/\/www.otterlakecmc.ca\/index.php?rest_route=\/wp\/v2\/pages\/1221\/revisions\/1697"}],"wp:attachment":[{"href":"https:\/\/www.otterlakecmc.ca\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1221"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}